Quick View (HTML - 14k) - Print Version (PDF - 73k)
Two 20-minute heats.
Note: Class debuted at Infineon Raceway - Sears Point, on November 27, 2004 and will be a 2005 local option class.
10.12.04: Per R.L.V. - Discontinue using "R2," when referencing the spec pipe. The spec pipe must be manufactured to the exact specifications as R.L.V. part #6800 (a one-piece stamped pipe) and may not be modified. If you have already purchased an RLV R2 pipe, in preparation to run in this new class, contact the webmaster.
|